Login

Joint letter from the European rail sector on concrete measures to face the COVID‐19 pandemic and its economic consequences

The representatives of European railways, combined transport and wagon load operators, wagon keepers, workshops and mobile services associations, on behalf of our members and of the European rail and intermodal sectors would like to thank all public authorities at all levels – European,  national  and  local – for  their  efforts  to  ensure  a  coordinated  and  […]

UIP 69th Annual Report 2018

UIP report on the changes in RID 2019

Joint Letter to the German Federal Minister Alexander Dobrindt and EU Commissioner Violeta Bulc on Rastatt disaster

Open letter from the representatives of the European rail logistics The Rhine valley railways will be interrupted for almost two months because of the Rastatt construction site accident. Once the route is reopened the announced date of 7 October 2017, railway logistics will have suffered immense damage. The Rastatt disruption and the current crisis management […]

JNS Urgent Procedure “Broken wheels” – Short-term measures agreed by the Task Force

Following an increasing number of reports on incidents (broken rims/webs of some wheel types) concerning freight wagons, a JNS Urgent Procedure (JNS UP) “Broken wheels” was kicked off. Within a short period of time, a task force drafted a proposal for short-term measures for operating and maintaining these types of wheel sets. The agreed target […]

UIP 67th Annual Report 2016

UIP report on the changes in RID 2017

The General Contract of Use (GCU)

UIP 66th Annual Report 2015

UIP technical note on marking of wagons flushed with nitrogen