Login

Joint Statement on the Fourth Railway Package Technical Pillar

UIP technical note on operational aspects of using LL brake blocks

UIP technical note on wagon markings

UIP 65th Annual Report 2014

GRB joint letter to CEN on closing of TSI open points

Paper prepared by the Group of Representative Bodies   This paper has been prepared by the Group of Representative Bodies (GRB) as a contribution to the work programme of CEN_CENELEC’s Sector Forum Rail (known to the rail community as the Joint Programming Committee – Rail (JPCR)) in order to influence the future work programme of […]

Joint letter to the European Commission on funding CEN budget

Joint letter from the Group of Representative Bodies to the Commissioner in charge of Internal Market, Industry, Entrepreneurship and SMEs   Dear Ms Bieńkowska, The Railway Sector is very active in supporting both the European Railway Agency and ‘CEN-CENELEC-ETSI’ for the development of the Interoperability and Safety regulations and the European technical standards. When it […]

GRB joint letter to ERA on assessment of 2015 Annual Work Programme

GRB Assessment of the ERA 2015 Annual Work Programme   The Group of Representative Bodies (GRB) welcomes the ERA prioritisation of outputs. Building on this proposed prioritisation, the GRB recommends to classify further outputs as “significant”. These activities identified as “Top priority” or “High priority” are recommended to be quickly developed and implemented, and appropriately […]

UIP 64th Annual Report 2013

4th Railway Package’s Technical Pillar: a top priority for the railway sector

UIP 63rd Annual Report 2012